No Permits, No Compromise
The fastest square footage you’ll ever add legally.
Under 120 sq ft. No permits. No delays.
The POD installs in days, not months.
No trenching, no paperwork, no headaches.
Installed in two days.
No permits, no red tape, no waiting.
And somehow…
it still ends up being the nicest place on your property.
Pro or Max
Speed and flexibility come standard.Choose your version.
Pod PRO
Practical Magic
Standard
Total Area
120 sq.ft.
Roofing
Metal Roof
Exterior Siding
WPC Panel
Interior Wall
Carbon-based Composite Panel
Flooring
Premium Wood Composite
AC
Cooling&Heating
Cabinet
Overhead Cabinet Set
Sound System
Enhanced Stereo System: 6-inch ceiling-mounted speakers
Upgrades
Pod Max
Pure Indulgence
Standard
Total Area
120 sq.ft.
Roofing
Metal Roof
Exterior Siding
WPC Panel
Interior Wall
Carbon-based Composite Panel
Flooring
Premium Wood Composite
AC
Cooling&Heating
Cabinet
Floor to Ceiling Cabinet System
Sound System
Enhanced Stereo System: Subwoofer, External Amplifier, 6 inch Bose Speaker
Projector
Wide-format Projector
Doors
Double Bifold Front-door
Upgrades
Why does adding 120 square feet take 180 days?
It doesn’t have to.
Today's construction process is trapped in endless permits and bureaucracy. We chose a different path.
By reimagining living spaces as premium, permit-free structures, we created something extraordinary - a space built better than most homes, yet installs in days.
No permits. No delays. No compromises.The best room in your house is ready to be delivered.
Join the Waitlist.
Save your spot.We’ll handle the rest.
We’re accepting expression of interest for our initial release
Early Birds Receive
First choice of pod style and featuresSpecial preview pricingBonus cash for custom upgrades
Limited availability for initial release
Less Waiting. More Living.
*The installation and use of the Pod must comply with all applicable local codes and regulations.
© 2025 LiveLarge. All rights reserved.