How Long Does It Take to Build an ADU in California? The Honest Timeline
How Long Does It Take to Build an ADU in California? The Honest Timeline
The real timeline for ADU construction in California: 6 months with prefab, 12+ months traditional (and why most companies won’t tell you this)
Hey there!
I’ve seen 8 homeowners lose their minds during ADU builds in the past 2 years.
The saddest story…
A couple in Palo Alto believed their contractor when he said their ADU would be finished in “just 4 months.” Two years and $85,000 in cost overruns later, they’re still using their half-finished ADU as an extremely expensive storage shed.
If you believe the 4-month timeline fantasy, you deserve the pain coming your way. The secret to ADU happiness? Realistic timelines from people who actually build these things for a living.
The LiveLarge Reality: 6 Months. Consistently.
At LiveLarge, we deliver ADUs in 6 months from contract to keys. This isn’t a one-time achievement we’re using for marketing – it’s our consistent average delivery schedule that we hit reliably.
We could promise shorter timelines to get you excited, but we’d rather set realistic expectations that we consistently meet or exceed.
Traditional Building Process: Why It Takes 12+ MONTHS
Even with the best contractors in the world, the traditional building process itself has inherent delays. I’ve worked with extremely skilled builders who still couldn’t overcome these systemic challenges. The traditional construction process typically takes 12+ MONTHS MINIMUM. Here’s why:
Why Our 6-Month Timeline Actually Happens
Not all prefab companies are created equal. Some hit 6 months, others are shockingly worse than traditional builds. We nail the 6-month timeline for four specific reasons that other companies can’t match:
What Can Actually Affect Your Timeline
Even with our streamlined process, a few factors can add time. We’d rather be upfront about these now than surprise you later:
The Bottom Line
Could we technically deliver some units in 3-4 months? Yes, with inventory units we sometimes hit 90 days. But we’re not here to sell you a fantasy timeline and then spend the next year explaining why we missed every deadline.
We say 6 months because that’s what consistently happens with our process. Not what we hope happens in some perfect parallel universe where permits are instant and concrete cures immediately.
We feel extreme confidence in our 6-month timeline because of two key factors most companies don’t have:
Getting an ADU should make your property better, not your life worse. That’s why we’ve built our entire business around being predictable and transparent – because you deserve to know exactly when you can stop paying for that storage unit and start enjoying your new space.
Ready to work with a company that respects your intelligence enough to tell you the truth? Let’s talk timelines, designs, and turning that empty space in your yard into something that actually gets built this decade.